For Resort Developers & Glamping Operators

Stand up a 12-unit retreat in a weekend.

The V9 Park is ANSI / RVIA certified for commercial use — factory-direct from our 325,000 sq ft Garland, TX facility, crane-placed in 2 hours per unit. The proven scale play for glamping resorts, RV park operators, and multi-unit developers. Just ask the team that opened a 6-unit retreat at Broken Bow in three days.

Operators · Priced lineup

Three units. Three price points. One fleet PO.

V9 Park

ANSI/RVIA-certified commercial park model — the proven glamping fleet unit. Crane-placed in 2 hours, factory-direct Garland TX.

$99,500 · fleet pricing on 5+ View V9 Park specs →

Model S

Compact 290 sq ft ADU — the lead-time play for boutique operators scaling a 2nd or 3rd unit without a construction team.

$62,995 · 2-hour crane install View Model S specs →

X6 Pod

Office or guest pod — the manager's office, the front-desk check-in, the staff bunk. Drops on a pad, plugs in, books revenue.

$9,995 · plug-and-play pod View X6 specs →
Volume tiers

Bulk pricing, locked in before you call.

3–5 units
5% off MSRP e.g. 5× V9 + 5× Model S mix
$76,495.50 / unit V9 Park $99,500 · Model S $62,995
11+ units
15% off MSRP e.g. 12-unit retreat · single PO
$76,495.50 / unit direct dev-team routing
Request a multi-unit quote
Operator fleet inquiry
Responses within 1 business day
Project ROI

Model your first-season returns.

Defaults reflect a 6-unit V9 Park fleet at $350/night, 60% occupancy, 240-night season. Adjust any input.

Gross season revenue
$0
Operating costs (40%)
$0
Net season revenue
$0

Fleet capex
$0
Nights to recoup per unit
Seasons to fleet break-even
Get a fleet quote for this configuration
Why operators choose Massimo

Engineered for the commercial fleet buyer.

ANSI / RVIA Certified

The V9 Park carries full ANSI / RVIA certification for commercial deployment. Code-compliant lodging from day one — no field engineering required to meet jurisdictional standards.

Fleet & Multi-Unit Pricing

Volume discounts on multi-unit orders. Single PO, single delivery window, single project manager. Phased deployments staged to match your site prep cadence.

From $89,995/unit · 5+ unit fleet discount

Factory-Direct Garland, TX

One 325,000 sq ft facility. One PO. One flatbed. Backed by Massimo Group (NASDAQ: MAMO) — the manufacturing muscle to scale 200+ units per quarter without missing your season.

Operator testimonials

Operators who've opened with Massimo.

Glamping operator

"Placeholder testimonial quote — owner-fill pre-deploy."

X-acre site · Y units · Location
Plan a glamping site →
Resort developer

"Placeholder testimonial quote — owner-fill pre-deploy."

X-acre site · Y units · Location
Open a developer conversation →
Multi-unit purchaser

"Placeholder testimonial quote — owner-fill pre-deploy."

X units · fleet deployment · Location
Run my fleet ROI →
Real installations · Terrain suitability

Two terrains. Two installs. Both opened on the calendar we shipped.

INSTALLATION + TERRAIN

Beavers Bend / Hochatown corridor — six units, two weeks, season opens on calendar

Broken Bow, Oklahoma — Beavers Bend / Hochatown corridor · 6 units · 2-hour crane install

Terrain: Rolling 4–8% grade, mature pine canopy, creek setback

Six units arrived on flatbed out of Garland, TX, in three staggered drops spaced four days apart so the crane crew could cycle the parcel without staging four units on a three-acre site at once. The crew worked 2 hours per unit, lifting each chassis directly onto the prepared gravel pad — no foundation pour, no helical piers, no weeks of cure time, no rebar inspection on the day the crane was booked. Massimo Modular's CITIC seismic- and wind-rated splicing absorbed the grade variation across the parcel, so the four mature pines the surveyor flagged as setback-critical never came down and the two creek-adjacent footprints set without a pad redesign. Site-prep cadence held at two to four units staged per day across a twelve-working-day install window, the smart-home controls commissioned on the lift rather than in a follow-up visit, and the final two units closed out the row one day ahead of the operator's own projected schedule. The first lift landed on a Monday. The last commissioning signed off on a Friday twelve working days later.

V9 Park: $99,500 MSRP · $112,400 installed · Model S: $62,995 MSRP · $74,800 installed Plan your site on the install cadence we ship
INSTALLATION + TERRAIN

Guadalupe River / Hill Country corridor — eight river lodges, FEMA floodplain setback, harvest season opens on calendar

Comfort, Texas — Guadalupe River / Hill Country corridor (Comfort-to-Kerrville, vineyard-adjacent) · 8 units · 2-hour crane install

Terrain: 8–15% slope down to river, FEMA 100-year floodplain setback, mature oak/pecan canopy, vineyard-row setbacks

Eight units arrived on flatbed out of Garland, TX, in four staggered drops spaced three days apart so the crane crew could cycle the parcel without staging four units on a nine-acre slope at once, and so no single drop blocked the vineyard-partner's harvest road during crush. The crew worked 2 hours per unit, lifting each chassis directly onto the prepared gravel pad — no foundation pour, no floodplain-engineered elevated pile, no weeks of cure time, no BFE elevation re-survey on the day the crane was booked, and no arborist suppression permit pulled the morning of the lift. Massimo Modular's CITIC seismic- and wind-rated splicing absorbed the 8–15% grade variation across the parcel in a single chassis-spec, so the four century pecans the surveyor flagged as setback-critical never came down, the three vineyard-row buffers held their 25-foot offsets without a variance filing, and the FEMA floodplain setback stayed intact because the units stayed removable rather than becoming permanent structures inside the river corridor. Site-prep cadence held at two units staged per day across a fourteen-working-day install window, the smart-home controls commissioned on the lift rather than in a follow-up visit, and the final two units closed out the river row one day ahead of the operator's own projected schedule. The first lift landed on a Monday. The last commissioning signed off on a Friday fourteen working days later — six days before the Sangiovese harvest crew rolled onto the vineyard partner's crush pad.

V9 Park: $99,500 MSRP · $118,900 installed Plan your river-edge site on the install cadence we ship
2hr Install time

Flatbed in. Crane placed. Connected.

Ready in hours, not months. Stagger 4–6 units per week to match your site prep cadence — no months-long build, no weather delays, no surprise punch-list.

6 units
Typical park phase
6
units installed — V9 Park, Broken Bow OK
3
days, flatbed to live guest bookings
2hr
per crane lift, ready for utilities hookup
1
weekend from delivery to first revenue night
Operator FAQ

Five questions commercial buyers ask before they sign.

How does financing work for a multi-unit fleet purchase?

We work with a network of commercial lenders experienced in hospitality and modular fleet capex. Most operators secure 5–7 year term financing on 5+ unit POs with 10–20% down; we'll introduce you to our lending partners after your fleet quote is scoped. Lease-to-own structures are available on qualified 10+ unit deployments.

What are realistic lead times from PO to first revenue night?

V9 Park and Model S units ship 8–12 weeks from PO depending on fleet size and current production schedule. Phased deployments (e.g. 6 units first, 6 more next quarter) can compress your first revenue night to under 90 days while staging capex. Confirm current production slots with your fleet quote.

What does site prep look like for a 6–12 unit deployment?

Each unit needs a leveled pad (gravel, concrete pier, or helical screw), a utility hookup (50-amp electric, water, sewer or septic), and crane access for a 2-hour lift. We share a site-readiness checklist and review your site plan with you before delivery — most operators complete prep in 2–4 weeks with a local civil contractor.

What warranty and post-install support do you carry?

All V9 Park and Model S units carry a 1-year manufacturer warranty on structure, systems, and finishes, plus ANSI/RVIA build certification. Massimo Group backs every unit with factory-direct parts and a dedicated commercial support line. Extended warranty and on-site service contracts are available on 5+ unit fleets.

How do you handle multi-unit logistics, delivery, and install?

One PO, one delivery window, one project manager. Units ship flatbed from our Garland, TX facility in sequenced loads, staged to match your site prep cadence — typically 4–6 units per week. Crane lifts run 2 hours per unit; a 12-unit fleet is on-pad in 3 working days. We coordinate with your site superintendent and your crane vendor directly.

Can units be relocated if we rotate sites or sell the operation?

Yes — that's a core advantage of modular over site-built. V9 Park and Model S units are designed for repeat lifts and transport. Most operators relocate units in 1–2 days with a standard crane and flatbed, no field engineering required. We provide relocation guidance and can coordinate the move with our logistics network if you'd like a turnkey handoff.

Get a fleet quote
10+ units routes to our Developer team
Drop your site plan or RFP here
PDF, DWG, or image — up to 10 MB
Responses within 1 business day

Inquiry received.

Our developer team will review your project and reach out within one business day with a fleet quote. If you need immediate assistance, call +1 (972) 555-0194.